Germany>Inn
The hydropower-plant near Kirchbichl (Tyrol, Austria) is one o the biggest diversion-type hydroelectric plant in Tyrol. The total water discharge of the river Inn between October and May for the operation of the hydropower-plant is used, hence no water donation for residual flow is available for several months. For the implementation of the WFD and in order to reach (maintain) the status “good ecological potential, several pilot investigation are planned.
SHARE_WP4.4_Inn_alternatives_and_MCA_tree_V2.0_PP7_07.2011.pdf
—
PDF document,
912Kb
